Skip to main content

Express Yourself, Part 2 – Tallgrass/Rockies Express’s Recontracting Efforts for Rockies Gas Flows

By May 16, 2025No Comments

For much of the time since it began operations, the capacity on Tallgrass Energy’s Rockies Express Pipeline has been contracted and utilized at high rates for long-haul flows east from the Rockies to the Midwest. Specifically, the pipeline consistently has had between 1.3 and 1.8 Bcf/d out of a total 1.8 Bcf/d contracted, mostly for 10-year terms. That all changed in the past year, however, as the original long-term shipper contracts that took effect in 2009 came due and the pipeline experienced a major decontracting, with the bulk of the contracts rolling off in November 2019. Since then, a number of open seasons led to a partial recontracting. Tallgrass also is developing two projects — Cheyenne Connector and REX Cheyenne Hub Enhancement — that could increase flows to REX later this year. Today, we continue a series providing an update on eastbound pipeline contracts and gas flows on REX.

Leave a Reply